Smart Mooring Solutions

Project Summary

TADEK and Tardra collaborated to develop a robust mooring solution for a floating offshore wind development, progressing from conceptual anchor design and geotechnical assessment through to installation methodology, vessel selection, commercial evaluation and operational risk assessment. 

The Challenge

Significant geotechnical variability across the site required a flexible yet practical anchoring strategy. 

  • Soil conditions varied significantly across the development area 
  • Multiple anchor concepts required evaluation 
  • Full field installation needed to minimise anchor types
  • Equipment and vessel spreads required optimisation 
  • Installation strategy needed to support a simple commercial T&I model 

TADEK‘s Role

TADEK supported the engineering and operational definition of the mooring system.

  • Evaluated anchor concepts including driven and drilled piles
  • Assessed installation vessel spreads and deck layouts
  • Developed operational installation sequences and storyboards
  • Performed commercial and operational risk assessments
  • Supported integration of engineering with project delivery strategy

Our Approach

A staged engineering approach combined geotechnical assessment, installation planning and market analysis.

  • Assessed soil conditions to identify viable anchor solutions
  • Defined installation spreads and offshore support requirements
  • Applied combined installation strategies across anchor types
  • Evaluated vessel availability and market readiness
  • Aligned engineering with commercial and contractual considerations

Outcomes

The study delivered a clear pathway for practical and commercially viable mooring installation.

  • Anchoring strategy aligned with variable site conditions
  • Installation methodology based on proven vessels and equipment
  • Reduced project risk through simplified anchor typologies
  • Commercial dossier prepared for developers and T&I contractors
  • Increased stakeholder confidence in project constructability

YEAR

2024

REGION

Undisclosed

MARKET

Renewables

TADEK TEAM

Talk to our specialists.

Andrew French

Director of Structural Design & Drilling
( CEng, MIMechE )

Explore our full suite of offshore engineering services.